Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Polyethylene film and bags
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $100
M
to 500
M
# of Employees 223
Plant Area 365,000
ft2
Annual Production 120,000,000
lb
Production Hrs. Annual 8,712
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,157,565 38,077,815
kWh
Electricity Demand $547,184 69,696
kW-mo/yr
Electricity Fees $42,336 -
Natural Gas $57,155 8,243
MMBtu
Waste Disposal Costs
Water Usage $15,596 2,047
Tgal
TOTAL YEARLY COSTS $1,819,836
RECOMMENDED SAVINGS* $86,469 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,439

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2511: Insulate bare equipment $46,030 $25,900 $32,300
1,059,400
kWh
$13,730
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $20,200 $60,000 $14,200
465,000
kWh
$6,000
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,400 $2,000 $8,200
271,200
kWh
$3,200
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $6,155 $38 $4,480
146,400
kWh
$1,675
-
kW-mo/yr
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,244 - $1,318
43,213
kWh
$926
-
kW-mo/yr
06 2.7111: Reduce illumination to minimum necessary levels $440 $100 $250
8,300
kWh
$190
-
kW-mo/yr
TOTAL RECOMMENDED $86,469 $88,038 $60,748
1,993,513
kWh
$25,721
-
kW-mo/yr
TOTAL IMPLEMENTED $40,439 $62,138 $28,448
934,113
kWh
$11,991
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs