223
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Soap and other detergent manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LE0347 #02 Y:2012 | 02 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,654 | $1,000 | |
| LE0347 #01 Y:2012 | 01 | 2012 | Reduce the pressure of compressed air to the minimum required | $1,060 | $40 | |
| LE0322 #04 Y:2011 | 04 | 2011 | Install occupancy sensors | $188 | $175 | |
| LE0322 #03 Y:2011 | 03 | 2011 | Utilize higher efficiency lamps and/or ballasts | $781 | $8,625 | |
| LE0322 #02 Y:2011 | 02 | 2011 | Use / purchase optimum sized compressor | $3,000 | $8,500 | |
| LE0322 #01 Y:2011 | 01 | 2011 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,515 | $1,000 | |
| SF0348 #06 Y:2007 | 06 | 2007 | Use solar heat to make electricty | $30,094 | $400,105 | |
| SF0348 #05 Y:2007 | 05 | 2007 | Utilize higher efficiency lamps and/or ballasts | $205 | $1,020 | |
| SF0348 #04 Y:2007 | 04 | 2007 | Utilize higher efficiency lamps and/or ballasts | $2,324 | $16,819 | |
| SF0348 #03 Y:2007 | 03 | 2007 | Reduce the pressure of compressed air to the minimum required | $865 | $2,974 | |
| SF0348 #02 Y:2007 | 02 | 2007 | Change rate schedules or other changes in utility service | $4,133 | $7,320 | |
| SF0348 #01 Y:2007 | 01 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $811 | - | |
| MZ0003 #06 Y:2007 | 06 | 2007 | Add area lighting switches | $3,995 | $500 | |
| MZ0003 #05 Y:2007 | 05 | 2007 | Install occupancy sensors | $5,992 | $2,950 | |
| MZ0003 #04 Y:2007 | 04 | 2007 | Disconnect ballasts | $45,032 | $4,012 | |
| MZ0003 #03 Y:2007 | 03 | 2007 | Use waste heat from hot flue gases to preheat | $23,859 | $30,000 | |
| MZ0003 #02 Y:2007 | 02 | 2007 | Use adjustable frequency drive or multiple speed motors on existing system | $56,702 | $7,764 | |
| MZ0003 #01 Y:2007 | 01 | 2007 | Replace boiler | $237,208 | $220,000 | |
| AM0521 #11 Y:2006 | 11 | 2006 | Insulate bare equipment | $180 | $150 | |
| AM0521 #10 Y:2006 | 10 | 2006 | Optimize plant power factor | $900 | $1,620 |