ITAC Assessment: LE0322
ITAC logo
ITAC Assessment: LE0322
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Cleaning and Sanitization Products
NAICS 325611: Soap and Other Detergent Manufacturing
SIC 2841: Soap and Other Detergents, Except Specialty Cleaners
Sales Range $10
M
to 50
M
# of Employees 52
Plant Area 49,500
ft2
Annual Production 75,000
Tgal
Production Hrs. Annual 2,080
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,859 843,072
kWh
Electricity Demand $20,010 2,235
kW-mo/yr
Natural Gas $4,267 315
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,484 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,515

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,515 $1,000 $5,152
62,833
kWh
$2,363
-
kW-mo/yr
-
02 2.4226: Use / purchase optimum sized compressor $3,000 $8,500 $975
11,896
kWh
$618
-
kW-mo/yr
$1,407
03 2.7142: Utilize higher efficiency lamps and/or ballasts $781 $8,625 $435
5,304
kWh
$277
-
kW-mo/yr
$69
04 2.7135: Install occupancy sensors $188 $175 $188
2,288
kWh
- -
TOTAL RECOMMENDED $11,484 $18,300 $6,750
82,321
kWh
$3,258
-
kW-mo/yr
$1,476
TOTAL IMPLEMENTED $10,515 $9,500 $6,127
74,729
kWh
$2,981
-
kW-mo/yr
$1,407
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs