ITAC Assessment: SF0348
ITAC logo
ITAC Assessment: SF0348
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Toiletries and Soaps
NAICS 325611: Soap and Other Detergent Manufacturing
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 55,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 2,340
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,241 316,368
kWh
Electricity Demand $6,287 758
kW-mo/yr
Electricity Fees $6,251 -
Natural Gas $14,946 1,037
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,432 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,205

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $811 - $811
6,120
kWh
- -
02 2.8114: Change rate schedules or other changes in utility service $4,133 $7,320 - - $4,133
03 2.4231: Reduce the pressure of compressed air to the minimum required $865 $2,974 $865
5,034
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,324 $16,819 $2,324
13,528
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $205 $1,020 $205
1,193
kWh
- -
06 2.9114: Use solar heat to make electricty $30,094 $400,105 $24,726
209,382
kWh
$5,368
-
kW-mo/yr
-
TOTAL RECOMMENDED $38,432 $428,238 $28,931
235,257
kWh
$5,368
-
kW-mo/yr
$4,133
TOTAL IMPLEMENTED $4,205 $20,813 $4,205
25,875
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs