Assessment Year | 2007 |
---|---|
Principal Product | Toiletries and Soaps |
NAICS | 325611: Soap and Other Detergent Manufacturing |
SIC | 2844: Perfumes, Cosmetics, and Other Toilet Preparations |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
55,000
ft2
|
Annual Production | 1,000,000
units
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $42,241 | 316,368 |
kWh
|
$0.13 |
Electricity Demand | $6,287 | 758 |
kW-mo/yr
|
$8.29 |
Electricity Fees | $6,251 | - |
|
- |
Natural Gas | $14,946 | 1,037 |
MMBtu
|
$14.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $38,432 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,205 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $811 | - |
$811
6,120
kWh
|
- | - | |
02 | 2.8114: Change rate schedules or other changes in utility service | $4,133 | $7,320 | - | - | $4,133 | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $865 | $2,974 |
$865
5,034
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,324 | $16,819 |
$2,324
13,528
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $205 | $1,020 |
$205
1,193
kWh
|
- | - | |
06 | 2.9114: Use solar heat to make electricty | $30,094 | $400,105 |
$24,726
209,382
kWh
|
$5,368
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $38,432 | $428,238 |
$28,931
235,257
kWh
|
$5,368
-
kW-mo/yr
|
$4,133 | ||
TOTAL IMPLEMENTED | $4,205 | $20,813 |
$4,205
25,875
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs