Assessment Year | 2007 |
---|---|
Principal Product | shampoos, lotions, body wash |
NAICS | 325611: Soap and Other Detergent Manufacturing |
SIC | 2841: Soap and Other Detergents, Except Specialty Cleaners |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
550,000
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,500,000 | 36,915,121 |
kWh
|
$0.041 |
Natural Gas | $800,000 | 73,361 |
MMBtu
|
$10.90 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $372,788 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1224: Replace boiler | $237,208 | $220,000 | - |
$237,208
-
MMBtu
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $56,702 | $7,764 |
$56,702
1,012,528
kWh
|
- | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $23,859 | $30,000 | - |
$23,859
-
MMBtu
|
|
04 | 2.7122: Disconnect ballasts | $45,032 | $4,012 |
$45,032
759,492
kWh
|
- | |
05 | 2.7135: Install occupancy sensors | $5,992 | $2,950 |
$5,992
131,400
kWh
|
- | |
06 | 2.7131: Add area lighting switches | $3,995 | $500 |
$3,995
87,600
kWh
|
- | |
TOTAL RECOMMENDED | $372,788 | $265,226 |
$111,721
1,991,020
kWh
|
$261,067
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs