26
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | All other miscellaneous wood product manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0767 #05 Y:2023 | 05 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,428 | $5,428 | |
| OR0767 #04 Y:2023 | 04 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $17,167 | $14,238 | |
| OR0767 #03 Y:2023 | 03 | 2023 | Add equipment/ operators to reduce production bottleneck | $300,390 | $200,000 | |
| OR0767 #02 Y:2023 | 02 | 2023 | Level zero – install control systems for existing equipment | $172,773 | $37,200 | |
| OR0767 #01 Y:2023 | 01 | 2023 | Utilize energy-efficient belts and other improved mechanisms | $1,793 | - | |
| OR0699 #05 Y:2018 | 05 | 2018 | Use solar heat to make electricty | $592 | $10,650 | |
| OR0699 #04 Y:2018 | 04 | 2018 | Upgrade controls on compressors | $6,151 | $23,153 | |
| OR0699 #03 Y:2018 | 03 | 2018 | Utilize higher efficiency lamps and/or ballasts | $1,314 | $3,982 | |
| OR0699 #02 Y:2018 | 02 | 2018 | Recover waste heat from equipment | $1,077 | $2,087 | |
| OR0699 #01 Y:2018 | 01 | 2018 | Train operators for maximum operating efficiency | $4,167 | $1,495 | |
| OR0663 #05 Y:2015 | 05 | 2015 | Replace hydraulic / pneumatic equipment with electric equipment | $4,497 | $24,955 | |
| OR0663 #04 Y:2015 | 04 | 2015 | Utilize higher efficiency lamps and/or ballasts | $15,563 | $63,189 | |
| OR0663 #03 Y:2015 | 03 | 2015 | Reduce excess steam bleeding | $1,876 | $1,768 | |
| OR0663 #02 Y:2015 | 02 | 2015 | Insulate bare equipment | $11,122 | $6,541 | |
| OR0663 #01 Y:2015 | 01 | 2015 | Insulate bare equipment | $1,318 | $1,010 | |
| OR0616 #04 Y:2013 | 04 | 2013 | Eliminate leaks in inert gas and compressed air lines/ valves | $645 | $750 | |
| OR0616 #03 Y:2013 | 03 | 2013 | Optimize plant power factor | $2,727 | $11,025 | |
| OR0616 #02 Y:2013 | 02 | 2013 | Utilize higher efficiency lamps and/or ballasts | $1,132 | $6,100 | |
| OR0616 #01 Y:2013 | 01 | 2013 | Install sensors to detect defects | $145,630 | $200 | |
| OR0575 #07 Y:2011 | 07 | 2011 | Install occupancy sensors | $4,280 | $2,630 |