Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
$
$
ARC 2+ Digits Required
NAICS All other miscellaneous wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0767 #05 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $5,428 $5,428
OR0767 #04 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $17,167 $14,238
OR0767 #03 Y:2023 Add equipment/ operators to reduce production bottleneck $300,390 $200,000
OR0767 #02 Y:2023 Level zero – install control systems for existing equipment $172,773 $37,200
OR0767 #01 Y:2023 Utilize energy-efficient belts and other improved mechanisms $1,793 -
OR0699 #05 Y:2018 Use solar heat to make electricty $592 $10,650
OR0699 #04 Y:2018 Upgrade controls on compressors $6,151 $23,153
OR0699 #03 Y:2018 Utilize higher efficiency lamps and/or ballasts $1,314 $3,982
OR0699 #02 Y:2018 Recover waste heat from equipment $1,077 $2,087
OR0699 #01 Y:2018 Train operators for maximum operating efficiency $4,167 $1,495
OR0663 #05 Y:2015 Replace hydraulic / pneumatic equipment with electric equipment $4,497 $24,955
OR0663 #04 Y:2015 Utilize higher efficiency lamps and/or ballasts $15,563 $63,189
OR0663 #03 Y:2015 Reduce excess steam bleeding $1,876 $1,768
OR0663 #02 Y:2015 Insulate bare equipment $11,122 $6,541
OR0663 #01 Y:2015 Insulate bare equipment $1,318 $1,010
OR0616 #04 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $645 $750
OR0616 #03 Y:2013 Optimize plant power factor $2,727 $11,025
OR0616 #02 Y:2013 Utilize higher efficiency lamps and/or ballasts $1,132 $6,100
OR0616 #01 Y:2013 Install sensors to detect defects $145,630 $200
OR0575 #07 Y:2011 Install occupancy sensors $4,280 $2,630