ITAC Assessment: OR0699
ITAC logo
ITAC Assessment: OR0699
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Wood Furniture
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $1
M
to 5
M
# of Employees 34
Plant Area 38,688
ft2
Annual Production 657,760
units
Production Hrs. Annual 2,080
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,631 419,125
kWh
Electricity Demand $13,592 2,016
kW-mo/yr
Electricity Fees $3,000 -
Natural Gas $12,994 1,938
MMBtu
Waste Disposal Costs
Water Usage $978 38,322
Tgal
Water Disposal $1,614 33,353
Tgal
TOTAL YEARLY COSTS $60,809
RECOMMENDED SAVINGS* $13,301 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,632

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 4.431: Train operators for maximum operating efficiency $4,167 $1,495 - - - - $4,167 -
02 2.2437: Recover waste heat from equipment $1,077 $2,087 - - $1,077
-
MMBtu
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,314 $3,982 $828
10,962
kWh
$396
-
kW-mo/yr
- $114 - $(-24.0)
04 2.4224: Upgrade controls on compressors $6,151 $23,153 $4,167
55,187
kWh
$1,984
-
kW-mo/yr
- - - -
05 2.9114: Use solar heat to make electricty $592 $10,650 $592
7,838
kWh
- - - - -
TOTAL RECOMMENDED $13,301 $41,367 $5,587
73,987
kWh
$2,380
-
kW-mo/yr
$1,077
-
MMBtu
$114 $4,167 $(-24.0)
TOTAL IMPLEMENTED $11,632 $28,630 $4,995
66,149
kWh
$2,380
-
kW-mo/yr
- $114 $4,167 $(-24.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs