ITAC Assessment: NC0009
ITAC logo
ITAC Assessment: NC0009
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Furniture
NAICS
n/a
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area 90,500
ft2
Annual Production 0
units
Production Hrs. Annual 2,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,036 992,966
kWh
Natural Gas $7,747 1,387
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,887 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,938

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,251 $252 $2,251
30,774
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,879 $540 $1,879
25,791
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,131 $4,459 $1,131
15,533
kWh
-
04 2.4239: Eliminate or reduce compressed air usage $1,400 $960 $1,400
19,050
kWh
-
05 2.7229: Air condition only space necessary $2,858 $2,000 - $2,858
-
MMBtu
06 2.7316: Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $2,408 - - $2,408
-
MMBtu
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,960 $2,000 $3,960
-
kWh
-
TOTAL RECOMMENDED $15,887 $10,211 $10,621
91,148
kWh
$5,266
-
MMBtu
TOTAL IMPLEMENTED $7,938 $1,752 $5,530
75,615
kWh
$2,408
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs