ITAC Assessment: OR0767
ITAC logo
ITAC Assessment: OR0767
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Lumber
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 29
Plant Area 21,780,000
ft2
Annual Production 18,000
thousand feet
Production Hrs. Annual 2,040
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $142,997 2,269,800
kWh
Electricity Demand $38,760 6,460
kW-mo/yr
Electricity Fees $3,301 -
Natural Gas $254,857 42,138
MMBtu
Waste Disposal Costs
Solid Waste (non-haz) $4,773 260,000
lb
TOTAL YEARLY COSTS $444,688
RECOMMENDED SAVINGS* $497,551 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $473,163

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,793 - $1,284
20,378
kWh
$509
-
kW-mo/yr
-
02 4.661: Level zero – install control systems for existing equipment $172,773 $37,200 - - $172,773
03 4.111: Add equipment/ operators to reduce production bottleneck $300,390 $200,000 - - $300,390
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,167 $14,238 $11,003
174,651
kWh
$6,164
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,428 $5,428 $4,184
66,413
kWh
$1,244
-
kW-mo/yr
-
TOTAL RECOMMENDED $497,551 $256,866 $16,471
261,442
kWh
$7,917
-
kW-mo/yr
$473,163
TOTAL IMPLEMENTED $473,163 $237,200 - - $473,163