Assessment Year | 2023 |
---|---|
Principal Product | Lumber |
NAICS | 321999: All Other Miscellaneous Wood Product Manufacturing |
SIC | 2499: Wood Products, Not Elsewhere Classified |
Sales Range | $1 M to 5M |
# of Employees | 29 |
Plant Area |
21,780,000
ft2
|
Annual Production | 18,000
thousand feet
|
Production Hrs. Annual | 2,040
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $142,997 | 2,269,800 |
kWh
|
$0.063 | |
Electricity Demand | $38,760 | 6,460 |
kW-mo/yr
|
$6.00 | |
Electricity Fees | $3,301 | - |
|
- | |
Natural Gas | $254,857 | 42,138 |
MMBtu
|
$6.05 | |
Waste Disposal Costs | |||||
Solid Waste (non-haz) | $4,773 | 260,000 |
lb
|
$0.018 | |
TOTAL YEARLY COSTS | $444,688 | ||||
RECOMMENDED SAVINGS* | $497,551 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $473,163 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,793 | - |
$1,284
20,378
kWh
|
$509
-
kW-mo/yr
|
- | |
02 | 4.661: Level zero – install control systems for existing equipment | $172,773 | $37,200 | - | - | $172,773 | |
03 | 4.111: Add equipment/ operators to reduce production bottleneck | $300,390 | $200,000 | - | - | $300,390 | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,167 | $14,238 |
$11,003
174,651
kWh
|
$6,164
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,428 | $5,428 |
$4,184
66,413
kWh
|
$1,244
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $497,551 | $256,866 |
$16,471
261,442
kWh
|
$7,917
-
kW-mo/yr
|
$473,163 | ||
TOTAL IMPLEMENTED | $473,163 | $237,200 | - | - | $473,163 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs