ITAC Assessment: NC0587
ITAC logo
ITAC Assessment: NC0587
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Hydraulic pumps and motors
NAICS 333911: Pump and Pumping Equipment Manufacturing
SIC 3561: Pumps and Pumping Equipment
Sales Range $50
M
to 100
M
# of Employees 259
Plant Area 184,000
ft2
Annual Production 180,000
pieces
Production Hrs. Annual 6,864
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $665,035 10,845,400
kWh
Electricity Demand $192,469 23,715
kW-mo/yr
Natural Gas $15,852 2,229
MMBtu
TOTAL YEARLY COSTS $873,356
RECOMMENDED SAVINGS* $135,158 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $72,078

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $64,592 $221,073 $47,219
770,296
kWh
$11,234
-
kW-mo/yr
- $6,139 -
02 2.7111: Reduce illumination to minimum necessary levels $375 $75 $252
4,118
kWh
$58
-
kW-mo/yr
- $65 -
03 2.7135: Install occupancy sensors $798 $400 $798
13,024
kWh
- - - -
04 2.2612: Use cooling tower water instead of refrigeration $62,705 $158,000 $42,413
691,892
kWh
$26,225
-
kW-mo/yr
- - $(-5,933.0)
-
Tgal
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,666 $500 $3,139
51,205
kWh
$727
-
kW-mo/yr
$(-100.0) $(-100.0) -
06 2.4239: Eliminate or reduce compressed air usage $3,022 $1,200 $3,022
49,280
kWh
- - - -
TOTAL RECOMMENDED $135,158 $381,248 $96,843
1,579,815
kWh
$38,244
-
kW-mo/yr
$(-100.0) $6,104 $(-5,933.0)
-
Tgal
TOTAL IMPLEMENTED $72,078 $223,173 $54,178
883,805
kWh
$11,961
-
kW-mo/yr
$(-100.0) $6,039 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs