ITAC Assessment: ME0161
ITAC logo
ITAC Assessment: ME0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Woolen Textile Products
NAICS
n/a
SIC 2231: Broadwoven Fabric Mills, Wool (Including Dyeing and Finishing)
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 51,120
ft2
Annual Production 2,620,293
lb
Production Hrs. Annual 4,400
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $297,495 3,113,716
kWh
Fuel Oil #6 $15,333 6,393
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,908 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,963

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #6 Savings
01 2.4239: Eliminate or reduce compressed air usage $7,095 $5,706 $7,095
78,253
kWh
-
02 2.7229: Air condition only space necessary $1,850 $5,304 - $1,850
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,236 $400 - $1,236
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $936 $300 $936
13,482
kWh
-
05 2.2511: Insulate bare equipment $570 $1,100 - $570
-
MMBtu
06 2.2511: Insulate bare equipment $221 $580 - $221
-
MMBtu
TOTAL RECOMMENDED $11,908 $13,390 $8,031
91,735
kWh
$3,877
-
MMBtu
TOTAL IMPLEMENTED $2,963 $2,380 $936
13,482
kWh
$2,027
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs