ITAC Assessment: OR0663
ITAC logo
ITAC Assessment: OR0663
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Crossarms
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 20
Plant Area 435,600
ft2
Annual Production 15,000
thousand feet
Production Hrs. Annual 6,552
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,731 1,392,680
kWh
Electricity Demand $58,520 8,072
kW-mo/yr
Electricity Fees $3,963 -
Natural Gas $33,868 3,378
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,376 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.2511: Insulate bare equipment $1,318 $1,010 - - $1,318
-
MMBtu
-
02 2.2511: Insulate bare equipment $11,122 $6,541 - - $11,122
-
MMBtu
-
03 2.2162: Reduce excess steam bleeding $1,876 $1,768 - - $1,876
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $15,563 $63,189 $10,486
172,352
kWh
$4,761
-
kW-mo/yr
- $316
05 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $4,497 $24,955 $2,096
34,447
kWh
$2,401
-
kW-mo/yr
- -
TOTAL RECOMMENDED $34,376 $97,463 $12,582
206,799
kWh
$7,162
-
kW-mo/yr
$14,316
-
MMBtu
$316
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs