ITAC Assessment: LM0092
ITAC logo
ITAC Assessment: LM0092
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Heat treating
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $10
M
to 50
M
# of Employees 52
Plant Area 192,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $234,802 2,983,855
kWh
Electricity Demand $92,136 8,340
kW-mo/yr
Electricity Fees $17,126 -
Natural Gas $839,510 130,869
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $252,163 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $248,481

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,559 $2,640 $1,106
13,751
kWh
$453
-
kW-mo/yr
- - - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,912 $760 $1,483
18,433
kWh
$429
-
kW-mo/yr
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,281 $170 $2,032
25,245
kWh
$1,249
-
kW-mo/yr
- - - -
04 2.4133: Use most efficient type of electric motors $211 $246 $165
2,052
kWh
$46
-
kW-mo/yr
- - - -
05 2.2314: Replace heat treating oven with more efficient unit $62,655 $140,000 $3,375
41,962
kWh
- $59,280
-
MMBtu
- - -
06 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $12,597 $5,000 - - - $12,597
-
MMBtu
- -
07 2.4239: Eliminate or reduce compressed air usage $19,657 $5,000 $16,319
202,872
kWh
$3,338
-
kW-mo/yr
- - - -
08 4.653: Maintain/enlarge a stock of spare parts $36,180 $5,000 - - - - - $36,180
09 4.111: Add equipment/ operators to reduce production bottleneck $98,438 $100,000 - - - - - $98,438
10 4.611: Begin a practice of predictive / preventative maintenance $14,473 $100 - - $(-4,574.0)
-
MMBtu
- $19,047 -
11 4.431: Train operators for maximum operating efficiency $1,200 $100 - - - - $(-10,800.0) $12,000
TOTAL RECOMMENDED $252,163 $259,016 $24,480
304,315
kWh
$5,515
-
kW-mo/yr
$54,706
-
MMBtu
$12,597
-
MMBtu
$8,247 $146,618
TOTAL IMPLEMENTED $248,481 $255,370 $21,726
270,079
kWh
$4,587
-
kW-mo/yr
$54,706
-
MMBtu
$12,597
-
MMBtu
$8,247 $146,618
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs