ITAC Assessment: OK0074
ITAC logo
ITAC Assessment: OK0074
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product LPG PUMPS/COMPRESSORS
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 11,000
pieces
Production Hrs. Annual 2,200
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,634 1,487,104
kWh
Natural Gas $9,194 2,910
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,030 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,932

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $1,596 $69 $233
7,034
kWh
$1,363
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,098 $136 $9,098
267,585
kWh
-
03 2.7261: Install timers and/or thermostats $6,118 $439 $2,508
73,857
kWh
$3,610
-
MMBtu
04 2.7314: Reduce ventilation air $2,218 $1,863 $435
12,896
kWh
$1,783
-
MMBtu
TOTAL RECOMMENDED $19,030 $2,507 $12,274
361,372
kWh
$6,756
-
MMBtu
TOTAL IMPLEMENTED $9,932 $2,371 $3,176
93,787
kWh
$6,756
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs