ITAC Assessment: IA0555
ITAC logo
ITAC Assessment: IA0555
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Tractor loaders
NAICS 333111: Farm Machinery and Equipment Manufacturing
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 82,300
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 2,250
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,392 1,096,800
kWh
Electricity Demand $45,155 4,584
kW-mo/yr
Natural Gas $40,137 7,507
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,063 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,507

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $19,345 $65,008 $13,996
227,975
kWh
$5,349
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,046 $9,800 $4,046
65,985
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,070 $190 $575
9,412
kWh
$495
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $574 $1,680 $574
9,329
kWh
- -
05 2.4239: Eliminate or reduce compressed air usage $518 $500 $84
1,320
kWh
$434
-
kW-mo/yr
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $304 $500 - - $304
-
MMBtu
07 2.4231: Reduce the pressure of compressed air to the minimum required $206 $30 $111
1,800
kWh
$95
-
kW-mo/yr
-
TOTAL RECOMMENDED $26,063 $77,708 $19,386
315,821
kWh
$6,373
-
kW-mo/yr
$304
-
MMBtu
TOTAL IMPLEMENTED $21,507 $67,378 $15,229
248,036
kWh
$6,278
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs