ITAC Assessment: OR0575
ITAC logo
ITAC Assessment: OR0575
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Fiber Board Door Skins
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 64
Plant Area 98,700
ft2
Annual Production 6,365,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,056,873 22,787,659
kWh
Electricity Demand $249,019 46,808
kW-mo/yr
Electricity Fees $1,757 -
Natural Gas $206,891 40,925
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,392 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,137

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.6218: Turn off equipment when not in use $1,800 - $1,800
38,700
kWh
- - - -
02 2.1113: Reduce combustion air flow to optimum $7,781 $500 - $7,781
-
MMBtu
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,748 $3,023 $2,748
56,905
kWh
- - - -
04 2.2136: Install / repair insulation on steam lines $3,389 $948 - - $3,389
-
MMBtu
- -
05 2.6218: Turn off equipment when not in use $8,400 $7,692 $8,400
173,200
kWh
- - - -
06 2.1113: Reduce combustion air flow to optimum $3,994 $16,460 - $3,994
-
MMBtu
- - -
07 2.7135: Install occupancy sensors $4,280 $2,630 $3,030
65,652
kWh
- - $300 $950
TOTAL RECOMMENDED $32,392 $31,252 $15,978
334,457
kWh
$11,775
-
MMBtu
$3,389
-
MMBtu
$300 $950
TOTAL IMPLEMENTED $6,137 $3,970 $2,748
56,905
kWh
- $3,389
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Energy Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs