ITAC Assessment: WI0132
ITAC logo
ITAC Assessment: WI0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product STEEL DRUMS
NAICS
n/a
SIC 3412: Metal Shipping Barrels, Drums, Kegs, and Pails
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area
n/a
Annual Production 500,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,814 859,906
kWh
Natural Gas $133,562 41,554
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,441 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $1,133 $2,100 - $1,133
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $541 $1,280 $541
4,982
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $188 $33 $188
1,758
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $433 - $433
4,103
kWh
-
05 2.7226: Use computer programs to optimize hvac performance $351 $500 $351
3,224
kWh
-
06 2.6212: Turn off equipment during breaks, reduce operating time $302 - $302
2,931
kWh
-
07 2.2136: Install / repair insulation on steam lines $279 $495 - $279
-
MMBtu
08 2.2511: Insulate bare equipment $214 $678 - $214
-
MMBtu
TOTAL RECOMMENDED $3,441 $5,086 $1,815
16,998
kWh
$1,626
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs