ITAC Assessment: LE0319
ITAC logo
ITAC Assessment: LE0319
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Canned Cat/Dog Food
NAICS 311111: Dog and Cat Food Manufacturing
SIC 2047: Dog and Cat Food
Sales Range $50
M
to 100
M
# of Employees 57
Plant Area 186,000
ft2
Annual Production 65,000,000
units
Production Hrs. Annual 8,400
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $545,259 5,149,664
kWh
Electricity Demand $250,846 18,103
kW-mo/yr
Natural Gas $569,098 81,829
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $146,815 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $46,983

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 3.4151: Minimize water usage $66,284 $168,000 - - $66,284
-
Tgal
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $30,212 $5,424 $25,389
239,524
kWh
$4,823
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $22,751 $160 $18,219
171,875
kWh
$4,532
-
kW-mo/yr
-
04 2.1212: Operate boilers on high fire setting $16,771 - $16,771
158,215
kWh
- -
05 3.4155: Meter waste water $10,797 $3,240 $10,797
101,774
kWh
- -
TOTAL RECOMMENDED $146,815 $176,824 $71,176
671,388
kWh
$9,355
-
kW-mo/yr
$66,284
-
Tgal
TOTAL IMPLEMENTED $46,983 $5,424 $42,160
397,739
kWh
$4,823
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs