Assessment Year | 2004 |
---|---|
Principal Product | Beverages |
NAICS | 311421: Fruit and Vegetable Canning |
SIC | 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies |
Sales Range | $50 M to 100M |
# of Employees | 123 |
Plant Area |
350,000
ft2
|
Annual Production | 12,500,000
pieces
|
Production Hrs. Annual | 5,000
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $486,249 | 11,364,264 |
kWh
|
$0.043 |
Electricity Demand | $246,738 | 25,836 |
kW-mo/yr
|
$9.55 |
Natural Gas | $680,893 | 83,747 |
MMBtu
|
$8.13 |
Fuel Oil #6 | $424,464 | 80,913 |
MMBtu
|
$5.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $359,947 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $48,630 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #6 Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1333: Convert combustion equipment to burn oil | $192,339 | $50,000 | n/a | - | - |
$680,863
-
MMBtu
|
$(-488,524.0)
-
MMBtu
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $105,726 | $58,053 | n/a | - | - |
$70,674
-
MMBtu
|
$35,052
-
MMBtu
|
03 | 2.2113: Repair or replace steam traps | $17,227 | $492 | - | - |
$10,465
-
MMBtu
|
$6,762
-
MMBtu
|
|
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $14,446 | $2,000 | - | - |
$6,524
-
MMBtu
|
$7,922
-
MMBtu
|
|
05 | 2.2437: Recover waste heat from equipment | $13,252 | $10,720 | - | - |
$13,252
-
MMBtu
|
- | |
06 | 2.2123: Insulate feedwater tank | $11,953 | $4,508 | - | - |
$7,260
-
MMBtu
|
$4,693
-
MMBtu
|
|
07 | 2.4221: Install compressor air intakes in coolest locations | $3,349 | $3,768 |
$2,060
47,908
kWh
|
$1,289
-
kW-mo/yr
|
- | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,655 | $150 |
$1,080
25,108
kWh
|
$575
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $359,947 | $129,691 |
$3,140
73,016
kWh
|
$1,864
-
kW-mo/yr
|
$789,038
-
MMBtu
|
$(-434,095.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $48,630 | $10,918 |
$3,140
73,016
kWh
|
$1,864
-
kW-mo/yr
|
$24,249
-
MMBtu
|
$19,377
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #6 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs