ITAC Assessment: LE0193
ITAC logo
ITAC Assessment: LE0193
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Beverages
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $50
M
to 100
M
# of Employees 123
Plant Area 350,000
ft2
Annual Production 12,500,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $486,249 11,364,264
kWh
Electricity Demand $246,738 25,836
kW-mo/yr
Natural Gas $680,893 83,747
MMBtu
Fuel Oil #6 $424,464 80,913
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $359,947 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,630

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #6 Savings
01 2.1333: Convert combustion equipment to burn oil $192,339 $50,000 n/a - - $680,863
-
MMBtu
$(-488,524.0)
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $105,726 $58,053 n/a - - $70,674
-
MMBtu
$35,052
-
MMBtu
03 2.2113: Repair or replace steam traps $17,227 $492 - - $10,465
-
MMBtu
$6,762
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $14,446 $2,000 - - $6,524
-
MMBtu
$7,922
-
MMBtu
05 2.2437: Recover waste heat from equipment $13,252 $10,720 - - $13,252
-
MMBtu
-
06 2.2123: Insulate feedwater tank $11,953 $4,508 - - $7,260
-
MMBtu
$4,693
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $3,349 $3,768 $2,060
47,908
kWh
$1,289
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,655 $150 $1,080
25,108
kWh
$575
-
kW-mo/yr
- -
TOTAL RECOMMENDED $359,947 $129,691 $3,140
73,016
kWh
$1,864
-
kW-mo/yr
$789,038
-
MMBtu
$(-434,095.0)
-
MMBtu
TOTAL IMPLEMENTED $48,630 $10,918 $3,140
73,016
kWh
$1,864
-
kW-mo/yr
$24,249
-
MMBtu
$19,377
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs