ITAC Assessment: OR0616
ITAC logo
ITAC Assessment: OR0616
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Wood Pellets
NAICS 321999: All Other Miscellaneous Wood Product Manufacturing
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 12
Plant Area 67,000
ft2
Annual Production 17,000
units
Production Hrs. Annual 2,315
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,082 2,213,700
kWh
Electricity Demand $96,840 11,703
kW-mo/yr
Electricity Fees $23,598 -
Natural Gas $242,667 47,421
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $150,134 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $147,407

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 4.126: Install sensors to detect defects $145,630 $200 - - - $130
-
MMBtu
- - $145,500
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,132 $6,100 $580
10,805
kWh
$365
-
kW-mo/yr
- - $(-53.0) $240 -
03 2.3212: Optimize plant power factor $2,727 $11,025 - - $2,727 - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $645 $750 $645
12,015
kWh
- - - - - -
TOTAL RECOMMENDED $150,134 $18,075 $1,225
22,820
kWh
$365
-
kW-mo/yr
$2,727 $130
-
MMBtu
$(-53.0) $240 $145,500
TOTAL IMPLEMENTED $147,407 $7,050 $1,225
22,820
kWh
$365
-
kW-mo/yr
- $130
-
MMBtu
$(-53.0) $240 $145,500
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs