| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0718 #03 Y:2019 | 03 | 2019 | Ventilation system to shut off when room is not in use | $7,386 | $27,337 | |
| OR0718 #02 Y:2019 | 02 | 2019 | Turn off equipment during breaks, reduce operating time | $47,893 | $5,142 | |
| OR0718 #01 Y:2019 | 01 | 2019 | Use waste heat from hot flue gases to preheat | $84,306 | $71,155 | |
| OR0679 #06 Y:2016 | 06 | 2016 | Replace boiler | $48,912 | $250,000 | |
| OR0679 #05 Y:2016 | 05 | 2016 | Utilize higher efficiency lamps and/or ballasts | $17,613 | $47,385 | |
| OR0679 #04 Y:2016 | 04 | 2016 | Use waste heat from hot flue gases to preheat | $31,513 | $47,575 | |
| OR0679 #03 Y:2016 | 03 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $10,003 | $10,369 | |
| OR0679 #02 Y:2016 | 02 | 2016 | Utilize energy-efficient belts and other improved mechanisms | $20,472 | - | |
| OR0679 #01 Y:2016 | 01 | 2016 | Turn off equipment when not in use | $74,285 | $6,200 | |
| OR0664 #04 Y:2015 | 04 | 2015 | Upgrade conveyors | $74,609 | $242,718 | |
| OR0664 #03 Y:2015 | 03 | 2015 | Install spectral reflectors / delamp | $12,507 | $32,393 | |
| OR0664 #02 Y:2015 | 02 | 2015 | Insulate bare equipment | $1,310 | $2,584 | |
| OR0664 #01 Y:2015 | 01 | 2015 | Redesign flow to minimize mass transfer length | $2,739 | - | |
| OR0657 #03 Y:2015 | 03 | 2015 | Adjust / maintain fork lift trucks for most efficient operation | $207,496 | $694,826 | |
| OR0657 #02 Y:2015 | 02 | 2015 | Insulate bare equipment | $24,174 | $32,596 | |
| OR0657 #01 Y:2015 | 01 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $48,205 | $50,205 | |
| OR0622 #04 Y:2013 | 04 | 2013 | Utilize higher efficiency lamps and/or ballasts | $7,279 | $15,410 | |
| OR0622 #03 Y:2013 | 03 | 2013 | Use heat from boiler blowdown to preheat boiler feed water | $8,423 | $20,917 | |
| OR0622 #02 Y:2013 | 02 | 2013 | Upgrade controls on compressors | $10,631 | $10,763 | |
| OR0622 #01 Y:2013 | 01 | 2013 | Improve combustion control capability | $9,626 | $1,814 |