Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Reconstituted wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0718 #03 Y:2019 Ventilation system to shut off when room is not in use $7,386 $27,337
OR0718 #02 Y:2019 Turn off equipment during breaks, reduce operating time $47,893 $5,142
OR0718 #01 Y:2019 Use waste heat from hot flue gases to preheat $84,306 $71,155
OR0679 #06 Y:2016 Replace boiler $48,912 $250,000
OR0679 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $17,613 $47,385
OR0679 #04 Y:2016 Use waste heat from hot flue gases to preheat $31,513 $47,575
OR0679 #03 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $10,003 $10,369
OR0679 #02 Y:2016 Utilize energy-efficient belts and other improved mechanisms $20,472 -
OR0679 #01 Y:2016 Turn off equipment when not in use $74,285 $6,200
OR0664 #04 Y:2015 Upgrade conveyors $74,609 $242,718
OR0664 #03 Y:2015 Install spectral reflectors / delamp $12,507 $32,393
OR0664 #02 Y:2015 Insulate bare equipment $1,310 $2,584
OR0664 #01 Y:2015 Redesign flow to minimize mass transfer length $2,739 -
OR0657 #03 Y:2015 Adjust / maintain fork lift trucks for most efficient operation $207,496 $694,826
OR0657 #02 Y:2015 Insulate bare equipment $24,174 $32,596
OR0657 #01 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $48,205 $50,205
OR0622 #04 Y:2013 Utilize higher efficiency lamps and/or ballasts $7,279 $15,410
OR0622 #03 Y:2013 Use heat from boiler blowdown to preheat boiler feed water $8,423 $20,917
OR0622 #02 Y:2013 Upgrade controls on compressors $10,631 $10,763
OR0622 #01 Y:2013 Improve combustion control capability $9,626 $1,814