ITAC Assessment: OR0679
ITAC logo
ITAC Assessment: OR0679
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Particle Board
NAICS 321219: Reconstituted Wood Product Manufacturing
SIC 2493: Reconstituted Wood Products
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 827,640
ft2
Annual Production 5,000,000
units
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,634,111 70,044,000
kWh
Natural Gas $1,308,716 426,292
MMBtu
TOTAL YEARLY COSTS $5,942,827
RECOMMENDED SAVINGS* $202,798 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $143,883

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.6218: Turn off equipment when not in use $74,285 $6,200 $74,285
1,122,803
kWh
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $20,472 - $20,472
309,426
kWh
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,003 $10,369 $10,003
151,191
kWh
- - -
04 2.2414: Use waste heat from hot flue gases to preheat $31,513 $47,575 - $31,513
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $17,613 $47,385 $18,394
278,023
kWh
- $(-1,087.0) $306
06 2.1224: Replace boiler $48,912 $250,000 - $48,912
-
MMBtu
- -
TOTAL RECOMMENDED $202,798 $361,529 $123,154
1,861,443
kWh
$80,425
-
MMBtu
$(-1,087.0) $306
TOTAL IMPLEMENTED $143,883 $101,160 $113,151
1,710,252
kWh
$31,513
-
MMBtu
$(-1,087.0) $306
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs