ITAC Assessment: NV0034
ITAC logo
ITAC Assessment: NV0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Precision Ceramic Parts
NAICS
n/a
SIC 3264: Porcelain Electrical Supplies
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 49,200
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,383 1,908,558
kWh
Natural Gas $102,789 17,270
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,696 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $8,070 $20,352 - $8,070
-
MMBtu
02 2.4133: Use most efficient type of electric motors $1,724 $2,492 $1,724
12,603
kWh
-
03 2.7134: Use photocell controls $286 $71 $286
2,345
kWh
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,616 - $3,616
-
kWh
-
TOTAL RECOMMENDED $13,696 $22,915 $5,626
14,948
kWh
$8,070
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs