ITAC Assessment: OR0622
ITAC logo
ITAC Assessment: OR0622
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Fiber Cement Siding
NAICS 321219: Reconstituted Wood Product Manufacturing
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 64
Plant Area 170,000
ft2
Annual Production 39,000
thousand feet
Production Hrs. Annual 8,064
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $419,912 8,736,000
kWh
Electricity Demand $275,010 33,808
kW-mo/yr
Electricity Fees $31,226 -
Natural Gas $270,049 76,688
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,959 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.1116: Improve combustion control capability $9,626 $1,814 $747
14,718
kWh
- $8,879
-
MMBtu
- -
02 2.4224: Upgrade controls on compressors $10,631 $10,763 $8,604
169,466
kWh
$2,027
-
kW-mo/yr
- - -
03 2.1243: Use heat from boiler blowdown to preheat boiler feed water $8,423 $20,917 - - $8,423
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,279 $15,410 $3,907
76,953
kWh
$1,536
-
kW-mo/yr
- $(-102.0) $1,938
TOTAL RECOMMENDED $35,959 $48,904 $13,258
261,137
kWh
$3,563
-
kW-mo/yr
$17,302
-
MMBtu
$(-102.0) $1,938
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs