ITAC Assessment: MZ0215
ITAC logo
ITAC Assessment: MZ0215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product packaged food
NAICS 311412: Frozen Specialty Food Manufacturing
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 46,000
ft2
Annual Production 2,800,000
pieces
Production Hrs. Annual 4,900
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,542 1,064,848
kWh
Electricity Demand $14,695 2,765
kW-mo/yr
Natural Gas $29,973 3,885
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,571 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,004

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,397 $8,400 $6,074
101,789
kWh
$1,323
-
kW-mo/yr
-
02 2.2511: Insulate bare equipment $2,514 $1,500 $2,238
37,513
kWh
$276
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $1,093 $220 $1,093
18,320
kWh
- -
04 2.7221: Lower temperature during the winter season and vice-versa $567 - $244
4,095
kWh
$53
-
kW-mo/yr
$270
-
MMBtu
TOTAL RECOMMENDED $11,571 $10,120 $9,649
161,717
kWh
$1,652
-
kW-mo/yr
$270
-
MMBtu
TOTAL IMPLEMENTED $11,004 $10,120 $9,405
157,622
kWh
$1,599
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs