Assessment Year | 2007 |
---|---|
Principal Product | Flow Master |
NAICS | 334513: Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial |
SIC | 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products |
Sales Range | $1 M to 5M |
# of Employees | 11 |
Plant Area |
25,000
ft2
|
Annual Production | 50,000
pieces
|
Production Hrs. Annual | 3,000
hrs
|
Location (State) | Louisiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $9,428 | 119,127 |
kWh
|
$0.079 |
Electricity Fees | $319 | - |
|
- |
Natural Gas | $2,835 | 134 |
MMBtu
|
$21.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,959 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,142 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7224: Reduce space conditioning during non-working hours | $1,724 | $222 |
$1,667
21,060
kWh
|
$57 | - | |
02 | 4.611: Begin a practice of predictive / preventative maintenance | $2,408 | $240 |
$878
11,100
kWh
|
$30 | $1,500 | |
03 | 2.4239: Eliminate or reduce compressed air usage | $599 | $545 |
$579
7,322
kWh
|
$20 | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $489 | $240 |
$473
5,980
kWh
|
$16 | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $397 | $15 |
$384
4,847
kWh
|
$13 | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $129 | $36 |
$125
1,584
kWh
|
$4 | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $116 | $70 |
$53
666
kWh
|
$2 | $61 | |
08 | 2.7135: Install occupancy sensors | $97 | $30 |
$94
1,192
kWh
|
$3 | - | |
TOTAL RECOMMENDED | $5,959 | $1,398 |
$4,253
53,751
kWh
|
$145 | $1,561 | ||
TOTAL IMPLEMENTED | $3,142 | $586 |
$1,529
19,330
kWh
|
$52 | $1,561 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs