ITAC Assessment: LL0270
ITAC logo
ITAC Assessment: LL0270
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Flow Master
NAICS 334513: Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $1
M
to 5
M
# of Employees 11
Plant Area 25,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 3,000
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $9,428 119,127
kWh
Electricity Fees $319 -
Natural Gas $2,835 134
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,959 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,142

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings
01 2.7224: Reduce space conditioning during non-working hours $1,724 $222 $1,667
21,060
kWh
$57 -
02 4.611: Begin a practice of predictive / preventative maintenance $2,408 $240 $878
11,100
kWh
$30 $1,500
03 2.4239: Eliminate or reduce compressed air usage $599 $545 $579
7,322
kWh
$20 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $489 $240 $473
5,980
kWh
$16 -
05 2.4231: Reduce the pressure of compressed air to the minimum required $397 $15 $384
4,847
kWh
$13 -
06 2.7111: Reduce illumination to minimum necessary levels $129 $36 $125
1,584
kWh
$4 -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $116 $70 $53
666
kWh
$2 $61
08 2.7135: Install occupancy sensors $97 $30 $94
1,192
kWh
$3 -
TOTAL RECOMMENDED $5,959 $1,398 $4,253
53,751
kWh
$145 $1,561
TOTAL IMPLEMENTED $3,142 $586 $1,529
19,330
kWh
$52 $1,561
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs