Assessment Year | 2011 |
---|---|
Principal Product | Railroad friction shoes |
NAICS | 331511: Iron Foundries |
SIC | 3321: Gray and Ductile Iron Foundries |
Sales Range | $50 M to 100M |
# of Employees | 158 |
Plant Area |
100,000
ft2
|
Annual Production | 6,000,000
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $717,180 | 13,923,600 |
kWh
|
$0.052 |
Electricity Demand | $266,218 | 31,891 |
kW-mo/yr
|
$8.35 |
Electricity Fees | $4,610 | - |
|
- |
Natural Gas | $201,689 | 23,486 |
MMBtu
|
$8.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $73,060 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,276 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $37,298 | $27,675 | - | - |
$37,298
-
MMBtu
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $22,669 | $39,646 |
$18,706
363,156
kWh
|
$5,038
-
kW-mo/yr
|
- | - | - | $(-1,075.0) | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $330 | $106 |
$260
5,040
kWh
|
$70
-
kW-mo/yr
|
- | - | - | - | |
04 | 3.4116: Meter recycled water (to reduce sewer charges) | $3,390 | $4,200 | - | - | - |
$3,390
-
Tgal
|
- | - | |
05 | 2.4151: Develop a repair/replace policy | $4,934 | $2,393 |
$4,570
69,849
kWh
|
$364
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.2437: Recover waste heat from equipment | $1,486 | $1,800 | - | - |
$1,486
-
MMBtu
|
- | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,953 | $100 |
$3,458
67,140
kWh
|
$935
-
kW-mo/yr
|
- | - | $(-1,200.0) | $(-240.0) | |
TOTAL RECOMMENDED | $73,060 | $75,920 |
$26,994
505,185
kWh
|
$6,407
-
kW-mo/yr
|
$38,784
-
MMBtu
|
$3,390
-
Tgal
|
$(-1,200.0) | $(-1,315.0) | ||
TOTAL IMPLEMENTED | $34,276 | $46,445 |
$26,994
505,185
kWh
|
$6,407
-
kW-mo/yr
|
- |
$3,390
-
Tgal
|
$(-1,200.0) | $(-1,315.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs