ITAC Assessment: OR0657
ITAC logo
ITAC Assessment: OR0657
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Particleboard
NAICS 321219: Reconstituted Wood Product Manufacturing
SIC 2493: Reconstituted Wood Products
Sales Range $50
M
to 100
M
# of Employees 175
Plant Area 750,000
ft2
Annual Production 148,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,086,844 50,604,000
kWh
LPG $188,546 9,485
MMBtu
Other Energy $622,812 72,808
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $279,875 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,205

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Other Energy Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $48,205 $50,205 $48,205
790,240
kWh
- - -
02 2.2511: Insulate bare equipment $24,174 $32,596 - - $24,174
-
MMBtu
-
03 2.8227: Adjust / maintain fork lift trucks for most efficient operation $207,496 $694,826 $(-53,082.0)
(-870,192)
kWh
$188,308
-
MMBtu
- $72,270
TOTAL RECOMMENDED $279,875 $777,627 $(-4,877.0)
(-79,952)
kWh
$188,308
-
MMBtu
$24,174
-
MMBtu
$72,270
TOTAL IMPLEMENTED $48,205 $50,205 $48,205
790,240
kWh
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs