ITAC Assessment: IP0109
ITAC logo
ITAC Assessment: IP0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Automotive Lighting Products
NAICS 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3647: Vehicular Lighting Equipment
Sales Range greater than $500
M
# of Employees 1,298
Plant Area 538,058
ft2
Annual Production 12,140,951
units
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,721,283 45,652,132
kWh
Electricity Demand $579,946 94,081
kW-mo/yr
Electricity Fees $362,506 -
Natural Gas $67,040 33,219
MMBtu
TOTAL YEARLY COSTS $3,730,775
RECOMMENDED SAVINGS* $108,028 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,173

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $8,423 - $5,352
89,790
kWh
- $3,071
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,107 $59 $1,758
29,484
kWh
$349
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $19,901 $2,251 $16,205
271,857
kWh
$3,696
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $30,301 $51,647 $24,937
418,335
kWh
$5,364
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $1,506 $1,246 $1,506
25,270
kWh
- -
06 2.4133: Use most efficient type of electric motors $1,342 $5,885 $1,120
18,782
kWh
$222
-
kW-mo/yr
-
07 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $44,448 $205,000 $9,004
151,052
kWh
- $35,444
-
MMBtu
TOTAL RECOMMENDED $108,028 $266,088 $59,882
1,004,570
kWh
$9,631
-
kW-mo/yr
$38,515
-
MMBtu
TOTAL IMPLEMENTED $42,173 $57,591 $33,167
556,391
kWh
$5,935
-
kW-mo/yr
$3,071
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs