ITAC Assessment: NV0126
ITAC logo
ITAC Assessment: NV0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Carbon Fiber Sailboat Mast & Spar
NAICS
n/a
SIC 3732: Boat Building and Repairing
Sales Range $5
M
to 10
M
# of Employees 52
Plant Area 38,000
ft2
Annual Production 120
pieces
Production Hrs. Annual 4,433
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,145 723,623
kWh
Electricity Demand $25,357 2,673
kW-mo/yr
Electricity Fees $1,026 -
Natural Gas $15,319 2,467
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,194 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,620

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $284 $70 $143
3,517
kWh
$141
-
kW-mo/yr
-
02 2.4224: Upgrade controls on compressors $1,034 $500 $1,034
24,912
kWh
- -
03 2.7231: Use radiant heater for spot heating $6,540 $7,980 - - $6,540
-
MMBtu
04 2.7243: Improve air circulation with destratification fans / other methods $821 $1,300 $(-83.0)
(-2,052)
kWh
$(-51.0)
-
kW-mo/yr
$955
-
MMBtu
05 2.7261: Install timers and/or thermostats $4,515 $1,400 $1,007
12,896
kWh
- $3,508
-
MMBtu
TOTAL RECOMMENDED $13,194 $11,250 $2,101
39,273
kWh
$90
-
kW-mo/yr
$11,003
-
MMBtu
TOTAL IMPLEMENTED $5,620 $2,770 $1,067
14,361
kWh
$90
-
kW-mo/yr
$4,463
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs