ITAC Assessment: GT0856
ITAC logo
ITAC Assessment: GT0856
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product High Voltage Electrical Switches
NAICS 335313: Switchgear and Switchboard Apparatus Manufacturing
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $50
M
to 100
M
# of Employees 340
Plant Area 175,000
ft2
Annual Production 17,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $159,033 3,334,800
kWh
Electricity Demand $123,636 8,076
kW-mo/yr
Electricity Fees $15,627 -
Natural Gas $105,974 10,675
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,381 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,976

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $11,537 $2,000 - - $11,537
-
MMBtu
-
02 2.6218: Turn off equipment when not in use $9,290 $2,000 $9,290
184,875
kWh
- - -
03 2.7261: Install timers and/or thermostats $8,620 $3,000 - - $8,620
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,097 $4,500 $16,097
320,089
kWh
- - $(-5,000.0)
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,723 - $1,875
37,299
kWh
$848
-
kW-mo/yr
- -
06 2.7444: Close holes and openings in building such as broken windows $8,400 $15,000 - - $8,400
-
MMBtu
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $8,385 $13,000 - - $8,385
-
MMBtu
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $30,329 $80,207 $16,098
320,303
kWh
$14,231
-
kW-mo/yr
- -
TOTAL RECOMMENDED $90,381 $119,707 $43,360
862,566
kWh
$15,079
-
kW-mo/yr
$36,942
-
MMBtu
$(-5,000.0)
TOTAL IMPLEMENTED $64,976 $88,707 $43,360
862,566
kWh
$15,079
-
kW-mo/yr
$11,537
-
MMBtu
$(-5,000.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs