ITAC Assessment: SD0158
ITAC logo
ITAC Assessment: SD0158
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Scanners and computer peripherals
NAICS
n/a
SIC 3577: Computer Peripheral Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 221
Plant Area 105,000
ft2
Annual Production 4,500
units
Production Hrs. Annual 2,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $204,046 1,762,016
kWh
Electricity Demand $35,939 4,938
kW-mo/yr
Natural Gas $5,715 871
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,254 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,844

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Other Liquid (haz) Savings
01 2.4133: Use most efficient type of electric motors $1,616 $2,210 $1,616
14,068
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,410 $40 $1,410
18,171
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $371 $756 $371
3,224
kWh
-
04 2.7144: Install spectral reflectors / delamp $3,949 $6,275 $3,949
35,463
kWh
-
05 3.8143: Recycle cleaning solvent and reuse $7,908 $7,200 - $7,908
-
gal
TOTAL RECOMMENDED $15,254 $16,481 $7,346
70,926
kWh
$7,908
-
gal
TOTAL IMPLEMENTED $13,844 $16,441 $5,936
52,755
kWh
$7,908
-
gal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs