| Assessment Year | 1985 |
|---|---|
| Principal Product | PUMPS & COMPRESSORS |
| NAICS |
n/a
|
| SIC | 3561: Pumps and Pumping Equipment |
| Sales Range | n/a |
| # of Employees | 340 |
| Plant Area |
n/a
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,864
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $306,690 | 5,700,762 |
kWh
|
$0.054 |
| Natural Gas | $36,937 | 7,621 |
MMBtu
|
$4.85 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $40,365 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,694 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,774 | $300 | - |
$1,774
-
MMBtu
|
|
| 02 | 2.4322: Use or replace with energy efficient substitutes | $10,968 | $58,000 |
$10,968
203,986
kWh
|
- | |
| 03 | 2.3191: Use demand controller or load shedder | $11,624 | $1,200 |
$11,624
-
kWh
|
- | |
| 04 | 2.4131: Size electric motors for peak operating efficiency | $9,585 | $15,000 |
$9,585
178,195
kWh
|
- | |
| 05 | 2.7243: Improve air circulation with destratification fans / other methods | $1,602 | $10,000 |
$(-1,182.0)
(-21,981)
kWh
|
$2,784
-
MMBtu
|
|
| 06 | 2.3512: De-energize excess transformer capacity | $920 | $250 |
$920
16,999
kWh
|
- | |
| 07 | 2.2223: Enhance sensitivity of temperature control and cutoff | $3,892 | $600 |
$3,892
72,392
kWh
|
- | |
| TOTAL RECOMMENDED | $40,365 | $85,350 |
$35,807
449,591
kWh
|
$4,558
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $2,694 | $550 |
$920
16,999
kWh
|
$1,774
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs