206
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Reconstituted wood product manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0664 #02 Y:2015 | 02 | 2015 | Insulate bare equipment | $1,310 | $2,584 | |
| OR0664 #01 Y:2015 | 01 | 2015 | Redesign flow to minimize mass transfer length | $2,739 | - | |
| OR0657 #03 Y:2015 | 03 | 2015 | Adjust / maintain fork lift trucks for most efficient operation | $207,496 | $694,826 | |
| OR0657 #02 Y:2015 | 02 | 2015 | Insulate bare equipment | $24,174 | $32,596 | |
| OR0657 #01 Y:2015 | 01 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $48,205 | $50,205 | |
| OR0622 #04 Y:2013 | 04 | 2013 | Utilize higher efficiency lamps and/or ballasts | $7,279 | $15,410 | |
| OR0622 #03 Y:2013 | 03 | 2013 | Use heat from boiler blowdown to preheat boiler feed water | $8,423 | $20,917 | |
| OR0622 #02 Y:2013 | 02 | 2013 | Upgrade controls on compressors | $10,631 | $10,763 | |
| OR0622 #01 Y:2013 | 01 | 2013 | Improve combustion control capability | $9,626 | $1,814 | |
| NC0427 #12 Y:2011 | 12 | 2011 | Increase amount of condensate returned | $126,880 | $500,000 | |
| NC0427 #11 Y:2011 | 11 | 2011 | Begin a practice of predictive / preventative maintenance | $2,500 | $1,050 | |
| NC0427 #10 Y:2011 | 10 | 2011 | Repair or replace steam traps | $5,500 | $150 | |
| NC0427 #09 Y:2011 | 09 | 2011 | Repair and eliminate steam leaks | $106,205 | $1,200 | |
| NC0427 #08 Y:2011 | 08 | 2011 | Begin a practice of predictive / preventative maintenance | $3,000 | $600 | |
| NC0427 #07 Y:2011 | 07 | 2011 | Insulate feedwater tank | $3,200 | $1,200 | |
| NC0427 #06 Y:2011 | 06 | 2011 | Begin a practice of predictive / preventative maintenance | $10,000 | $200 | |
| NC0427 #05 Y:2011 | 05 | 2011 | Lower operating pressure of condenser (steam) | $178,345 | $50,000 | |
| NC0427 #04 Y:2011 | 04 | 2011 | Keep boiler tubes clean | $104,205 | $18,000 | |
| NC0427 #03 Y:2011 | 03 | 2011 | Keep boiler tubes clean | $164,666 | $20,000 | |
| NC0427 #02 Y:2011 | 02 | 2011 | Analyze flue gas for proper air/fuel ratio | $209,278 | $1,200 |