215
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Reconstituted wood product manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UA0160 #07 Y:2016 | 07 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,220 | $2,995 | |
| UA0160 #06 Y:2016 | 06 | 2016 | Reduce the pressure of compressed air to the minimum required | $12,141 | $700 | |
| UA0160 #05 Y:2016 | 05 | 2016 | Utilize energy-efficient belts and other improved mechanisms | $12,685 | $1,300 | |
| UA0160 #04 Y:2016 | 04 | 2016 | Use photocell controls | $3,368 | $1,162 | |
| UA0160 #03 Y:2016 | 03 | 2016 | Utilize higher efficiency lamps and/or ballasts | $83,969 | $169,192 | |
| UA0160 #02 Y:2016 | 02 | 2016 | Reduce combustion air flow to optimum | $85,894 | - | |
| UA0160 #01 Y:2016 | 01 | 2016 | Use waste heat from hot flue gases to preheat | $221,404 | $94,081 | |
| OR0664 #04 Y:2015 | 04 | 2015 | Upgrade conveyors | $74,609 | $242,718 | |
| OR0664 #03 Y:2015 | 03 | 2015 | Install spectral reflectors / delamp | $12,507 | $32,393 | |
| OR0664 #02 Y:2015 | 02 | 2015 | Insulate bare equipment | $1,310 | $2,584 | |
| OR0664 #01 Y:2015 | 01 | 2015 | Redesign flow to minimize mass transfer length | $2,739 | - | |
| OR0657 #03 Y:2015 | 03 | 2015 | Adjust / maintain fork lift trucks for most efficient operation | $207,496 | $694,826 | |
| OR0657 #02 Y:2015 | 02 | 2015 | Insulate bare equipment | $24,174 | $32,596 | |
| OR0657 #01 Y:2015 | 01 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $48,205 | $50,205 | |
| OR0622 #04 Y:2013 | 04 | 2013 | Utilize higher efficiency lamps and/or ballasts | $7,279 | $15,410 | |
| OR0622 #03 Y:2013 | 03 | 2013 | Use heat from boiler blowdown to preheat boiler feed water | $8,423 | $20,917 | |
| OR0622 #02 Y:2013 | 02 | 2013 | Upgrade controls on compressors | $10,631 | $10,763 | |
| OR0622 #01 Y:2013 | 01 | 2013 | Improve combustion control capability | $9,626 | $1,814 | |
| NC0427 #12 Y:2011 | 12 | 2011 | Increase amount of condensate returned | $126,880 | $500,000 | |
| NC0427 #11 Y:2011 | 11 | 2011 | Begin a practice of predictive / preventative maintenance | $2,500 | $1,050 |