Assessment Year | 2016 |
---|---|
Principal Product | Medium Density Fiberboard |
NAICS | 321219: Reconstituted Wood Product Manufacturing |
SIC | 2493: Reconstituted Wood Products |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
43,600
ft2
|
Annual Production | 50,000
ton
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $5,364,753 | 107,812,560 |
kWh
|
$0.050 |
Wood | $1,222,822 | 698,755 |
MMBtu
|
$1.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $425,681 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $104,799 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Wood Savings |
---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $221,404 | $94,081 |
$5,589
112,315
kWh
|
$215,815
-
MMBtu
|
|
02 | 2.1113: Reduce combustion air flow to optimum | $85,894 | - | - |
$85,894
-
MMBtu
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $83,969 | $169,192 |
$83,969
1,687,477
kWh
|
- | |
04 | 2.7134: Use photocell controls | $3,368 | $1,162 |
$3,368
67,698
kWh
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $12,685 | $1,300 |
$12,685
254,917
kWh
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $12,141 | $700 |
$12,141
243,982
kWh
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,220 | $2,995 |
$6,220
124,990
kWh
|
- | |
TOTAL RECOMMENDED | $425,681 | $269,430 |
$123,972
2,491,379
kWh
|
$301,709
-
MMBtu
|
||
TOTAL IMPLEMENTED | $104,799 | $4,295 |
$18,905
379,907
kWh
|
$85,894
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs