| Assessment Year | 2016 |
|---|---|
| Principal Product | Medium Density Fiberboard |
| NAICS | 321219: Reconstituted Wood Product Manufacturing |
| SIC | 2493: Reconstituted Wood Products |
| Sales Range | $10 M to 50M |
| # of Employees | 110 |
| Plant Area |
43,600
ft2
|
| Annual Production | 50,000
ton
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $5,364,753 | 107,812,560 |
kWh
|
$0.050 |
| Wood | $1,222,822 | 698,755 |
MMBtu
|
$1.75 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $425,681 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $104,799 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Wood Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $221,404 | $94,081 |
$5,589
112,315
kWh
|
$215,815
-
MMBtu
|
|
| 02 | 2.1113: Reduce combustion air flow to optimum | $85,894 | - | - |
$85,894
-
MMBtu
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $83,969 | $169,192 |
$83,969
1,687,477
kWh
|
- | |
| 04 | 2.7134: Use photocell controls | $3,368 | $1,162 |
$3,368
67,698
kWh
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $12,685 | $1,300 |
$12,685
254,917
kWh
|
- | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $12,141 | $700 |
$12,141
243,982
kWh
|
- | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,220 | $2,995 |
$6,220
124,990
kWh
|
- | |
| TOTAL RECOMMENDED | $425,681 | $269,430 |
$123,972
2,491,379
kWh
|
$301,709
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $104,799 | $4,295 |
$18,905
379,907
kWh
|
$85,894
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Wood Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs