Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

189

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Softwood veneer and plywood manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0489 #01 Y:2005 Upgrade controls on compressors $19,500 $5,400
OR0456 #05 Y:2004 Use most efficient type of electric motors $11,550 $15,400
OR0456 #04 Y:2004 Optimize plant power factor $4,900 $12,600
OR0456 #03 Y:2004 Install / repair insulation on steam lines $12,900 $2,410
OR0456 #02 Y:2004 Keep boiler tubes clean $37,240 $1,760
OR0456 #01 Y:2004 Add/modify equipment to improve drying process $(-1,300.0) $5,000
OR0453 #09 Y:2003 Optimize plant power factor $3,020 $4,500
OR0453 #08 Y:2003 Turn off equipment when not in use $5,780 $6,900
OR0453 #07 Y:2003 Make a practice of turning off lights when not needed $11,370 $1,000
OR0453 #06 Y:2003 Eliminate leaks in inert gas and compressed air lines/ valves $6,400 $6,400
OR0453 #05 Y:2003 Reduce the pressure of compressed air to the minimum required $9,300 $9,460
OR0453 #04 Y:2003 Develop standard procedures to improve internal yields $113,000 $84,300
OR0453 #03 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $4,680 $6,920
OR0453 #02 Y:2003 Install / repair insulation on steam lines $10,100 $2,950
OR0453 #01 Y:2003 Analyze flue gas for proper air/fuel ratio $8,340 $150
OR0447 #04 Y:2003 Install / repair insulation on steam lines $2,460 $880
OR0447 #03 Y:2003 Establish burner maintenance schedule for boilers $28,720 $150
OR0447 #02 Y:2003 Install / repair insulation on steam lines $43,500 $4,910
OR0447 #01 Y:2003 Use fixtures to reduce machine changeout times $105,200 $7,000
WV0267 #12 Y:2003 Minimize water usage $6,675 $4,000