Assessment Year | 2004 |
---|---|
Principal Product | Plywood |
NAICS | 321212: Softwood Veneer and Plywood Manufacturing |
SIC | 2436: Softwood Veneer and Plywood |
Sales Range | $50 M to 100M |
# of Employees | 340 |
Plant Area |
n/a
|
Annual Production | 267,000
thousand feet
|
Production Hrs. Annual | 7,300
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $366,857 | 9,488,000 |
kWh
|
$0.039 |
Electricity Demand | $72,279 | 15,620 |
kW-mo/yr
|
$4.63 |
Electricity Fees | $26,584 | - |
|
- |
Natural Gas | $1,017,472 | 1,895,832 |
MMBtu
|
$0.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $171,990 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,340 | $150 | - | - | - |
$8,640
-
MMBtu
|
$(-300.0) | - | - | |
02 | 2.2136: Install / repair insulation on steam lines | $10,100 | $2,950 | - | - | - |
$10,100
-
MMBtu
|
- | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,680 | $6,920 |
$3,900
101,600
kWh
|
$780
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 4.122: Develop standard procedures to improve internal yields | $113,000 | $84,300 | - | - | - | - | - | - | $113,000 | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,300 | $9,460 |
$7,900
203,000
kWh
|
$1,400
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,400 | $6,400 |
$5,400
140,000
kWh
|
$1,000
-
kW-mo/yr
|
- | - | - | - | - | |
07 | 2.7124: Make a practice of turning off lights when not needed | $11,370 | $1,000 |
$7,300
189,200
kWh
|
$1,360
-
kW-mo/yr
|
- | - | $110 | $2,600 | - | |
08 | 2.6218: Turn off equipment when not in use | $5,780 | $6,900 |
$5,780
150,000
kWh
|
- | - | - | - | - | - | |
09 | 2.3212: Optimize plant power factor | $3,020 | $4,500 | - | - | $3,020 | - | - | - | - | |
TOTAL RECOMMENDED | $171,990 | $122,580 |
$30,280
783,800
kWh
|
$4,540
-
kW-mo/yr
|
$3,020 |
$18,740
-
MMBtu
|
$(-190.0) | $2,600 | $113,000 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs