ITAC Assessment: WV0267
ITAC logo
ITAC Assessment: WV0267
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Wood veneer
NAICS 321212: Softwood Veneer and Plywood Manufacturing
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 200,000
ft2
Annual Production 150,000,000
thousand feet
Production Hrs. Annual 4,335
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,964 4,327,670
kWh
Electricity Demand $113,149 12,765
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,641 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,895

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,580 - $3,808
72,685
kWh
$1,772
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,522 $2,820 $1,619
25,551
kWh
$903
-
kW-mo/yr
-
03 2.7111: Reduce illumination to minimum necessary levels $582 $150 $370
5,627
kWh
$212
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,402 $30 $2,603
64,478
kWh
$799
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $2,185 $135 $1,672
41,325
kWh
$513
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $353 $395 $271
6,741
kWh
$82
-
kW-mo/yr
-
07 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $9,920 $1,125 $6,837
146,835
kWh
$3,083
-
kW-mo/yr
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,946 - $5,737
117,526
kWh
$209
-
kW-mo/yr
-
09 2.2511: Insulate bare equipment $3,148 $1,475 - - $3,148
10 2.3212: Optimize plant power factor $2,644 $12,320 $2,644
-
kWh
- -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $684 $250 $684
16,999
kWh
- -
12 3.4151: Minimize water usage $6,675 $4,000 - - $6,675
TOTAL RECOMMENDED $43,641 $22,700 $26,245
497,767
kWh
$7,573
-
kW-mo/yr
$9,823
TOTAL IMPLEMENTED $32,895 $7,560 $18,174
399,531
kWh
$4,898
-
kW-mo/yr
$9,823
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs