ITAC Assessment: OR0447
ITAC logo
ITAC Assessment: OR0447
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product plywood
NAICS 321212: Softwood Veneer and Plywood Manufacturing
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area
n/a
Annual Production 108,000,000
thousand feet
Production Hrs. Annual 7,728
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $256,693 6,818,640
kWh
Electricity Demand $49,287 147,492
kW-mo/yr
Electricity Fees $5,724 -
Natural Gas $930,389 150,773
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $179,880 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $136,380

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 4.621: Use fixtures to reduce machine changeout times $105,200 $7,000 - $6,200 $99,000
02 2.2136: Install / repair insulation on steam lines $43,500 $4,910 $43,500
-
MMBtu
- -
03 2.1231: Establish burner maintenance schedule for boilers $28,720 $150 $28,720
-
MMBtu
- -
04 2.2136: Install / repair insulation on steam lines $2,460 $880 $2,460
-
MMBtu
- -
TOTAL RECOMMENDED $179,880 $12,940 $74,680
-
MMBtu
$6,200 $99,000
TOTAL IMPLEMENTED $136,380 $8,030 $31,180
-
MMBtu
$6,200 $99,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs