Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product ALUMINA-ZIRCONIA PRODUCT
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 82
Plant Area
n/a
Annual Production 18,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,133,005 43,893,905
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,232 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,402

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $3,132 $1,995 $3,132
64,478
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $18,570 - $18,570
378,077
kWh
03 2.7229: Air condition only space necessary $830 $320 $830
16,999
kWh
04 2.4221: Install compressor air intakes in coolest locations $700 $500 $700
14,361
kWh
TOTAL RECOMMENDED $23,232 $2,815 $23,232
473,915
kWh
TOTAL IMPLEMENTED $22,402 $2,495 $22,402
456,916
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs