ITAC Assessment: OR0456
ITAC logo
ITAC Assessment: OR0456
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Dried veneer
NAICS 321212: Softwood Veneer and Plywood Manufacturing
SIC 2436: Softwood Veneer and Plywood
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area 95,000
ft2
Annual Production 1,113,000
pieces
Production Hrs. Annual 8,320
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $305,246 7,789,100
kWh
Electricity Demand $76,971 16,565
kW-mo/yr
Electricity Fees $23,558 -
Natural Gas $1,209,141 233,877
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,290 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,550

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings
01 4.114: Add/modify equipment to improve drying process $(-1,300.0) $5,000 $(-1,107.0)
(-28,288)
kWh
$(-193.0)
-
kW-mo/yr
- - -
02 2.1232: Keep boiler tubes clean $37,240 $1,760 - - - $39,000
-
MMBtu
$(-1,760.0)
03 2.2136: Install / repair insulation on steam lines $12,900 $2,410 - - - $12,900
-
MMBtu
-
04 2.3212: Optimize plant power factor $4,900 $12,600 - - $4,900 - -
05 2.4133: Use most efficient type of electric motors $11,550 $15,400 $9,740
248,900
kWh
$1,810
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $65,290 $37,170 $8,633
220,612
kWh
$1,617
-
kW-mo/yr
$4,900 $51,900
-
MMBtu
$(-1,760.0)
TOTAL IMPLEMENTED $11,550 $15,400 $9,740
248,900
kWh
$1,810
-
kW-mo/yr
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs