Assessment Year | 1994 |
---|---|
Principal Product | Furniture Hardware |
NAICS |
n/a
|
SIC | 3429: Hardware, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 490 |
Plant Area |
344,000
ft2
|
Annual Production | 195,000,000
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $665,816 | 11,705,745 |
kWh
|
$0.057 |
Natural Gas | $589,359 | 137,221 |
MMBtu
|
$4.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $92,124 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $78,759 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $31,885 | $23,230 |
$31,885
560,668
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $19,025 | $750 |
$19,025
219,812
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,596 | $242 |
$12,596
221,571
kWh
|
- | - | |
04 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $8,963 | $12,476 | - |
$8,963
-
MMBtu
|
- | |
05 | 2.7135: Install occupancy sensors | $8,212 | $900 |
$8,212
144,490
kWh
|
- | - | |
06 | 3.1244: Reduce solution drag-out to prevent solution loss | $6,250 | $1,500 | - | - | $6,250 | |
07 | 2.1213: Direct warmest air to combustion intake | $5,153 | $1,000 | - |
$5,153
-
MMBtu
|
- | |
08 | 2.2511: Insulate bare equipment | $40 | $98 | - |
$40
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $92,124 | $40,196 |
$71,718
1,146,541
kWh
|
$14,156
-
MMBtu
|
$6,250 | ||
TOTAL IMPLEMENTED | $78,759 | $38,296 |
$63,506
1,002,051
kWh
|
$9,003
-
MMBtu
|
$6,250 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs