ITAC Assessment: ND0195
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Furniture Hardware
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 490
Plant Area 344,000
ft2
Annual Production 195,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $665,816 11,705,745
kWh
Natural Gas $589,359 137,221
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $92,124 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $78,759

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $31,885 $23,230 $31,885
560,668
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,025 $750 $19,025
219,812
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $12,596 $242 $12,596
221,571
kWh
- -
04 2.7491: Insulate glazing, walls, ceilings, and roofs $8,963 $12,476 - $8,963
-
MMBtu
-
05 2.7135: Install occupancy sensors $8,212 $900 $8,212
144,490
kWh
- -
06 3.1244: Reduce solution drag-out to prevent solution loss $6,250 $1,500 - - $6,250
07 2.1213: Direct warmest air to combustion intake $5,153 $1,000 - $5,153
-
MMBtu
-
08 2.2511: Insulate bare equipment $40 $98 - $40
-
MMBtu
-
TOTAL RECOMMENDED $92,124 $40,196 $71,718
1,146,541
kWh
$14,156
-
MMBtu
$6,250
TOTAL IMPLEMENTED $78,759 $38,296 $63,506
1,002,051
kWh
$9,003
-
MMBtu
$6,250
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs