ITAC Assessment: IA0546
ITAC logo
ITAC Assessment: IA0546
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Stock tanks
NAICS 332439: Other Metal Container Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 150,000
ft2
Annual Production 80,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,537 1,480,800
kWh
Electricity Demand $29,093 3,732
kW-mo/yr
Electricity Fees $1,052 -
Natural Gas $65,807 11,655
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,411 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,411

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,361 $6,263 $4,369
92,951
kWh
$992
-
kW-mo/yr
-
02 2.4133: Use most efficient type of electric motors $1,907 $7,104 $990
21,065
kWh
$917
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,451 $5,839 $1,451
30,865
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,230 $463 $1,002
21,373
kWh
$228
-
kW-mo/yr
-
05 2.6214: Shut off pilots in standby equipment $814 $60 - - $814
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $419 $539 $341
7,273
kWh
$78
-
kW-mo/yr
-
07 2.7447: Install vinyl strip / high speed / air curtain doors $229 $371 - - $229
-
MMBtu
TOTAL RECOMMENDED $11,411 $20,639 $8,153
173,527
kWh
$2,215
-
kW-mo/yr
$1,043
-
MMBtu
TOTAL IMPLEMENTED $11,411 $20,639 $8,153
173,527
kWh
$2,215
-
kW-mo/yr
$1,043
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs