202
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Hardwood veneer and plywood manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| BS0088 #03 Y:2016 | 03 | 2016 | Use adjustable frequency drive or multiple speed motors on existing system | $31,994 | $29,692 | |
| BS0088 #02 Y:2016 | 02 | 2016 | Lower operating pressure of condenser (steam) | $64,374 | $480 | |
| BS0088 #01 Y:2016 | 01 | 2016 | Install / repair insulation on steam lines | $7,541 | $11,782 | |
| UA0156 #05 Y:2016 | 05 | 2016 | Utilize energy-efficient belts and other improved mechanisms | $27,817 | $1,000 | |
| UA0156 #04 Y:2016 | 04 | 2016 | Reduce the pressure of compressed air to the minimum required | $28,560 | $700 | |
| UA0156 #03 Y:2016 | 03 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $30,024 | $6,995 | |
| UA0156 #02 Y:2016 | 02 | 2016 | Utilize higher efficiency lamps and/or ballasts | $78,495 | $82,466 | |
| UA0156 #01 Y:2016 | 01 | 2016 | Insulate feedwater tank | $34,968 | $50,000 | |
| UA0150 #04 Y:2015 | 04 | 2015 | Utilize energy-efficient belts and other improved mechanisms | $6,984 | $15,128 | |
| UA0150 #03 Y:2015 | 03 | 2015 | Reduce the pressure of compressed air to the minimum required | $8,195 | $800 | |
| UA0150 #02 Y:2015 | 02 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $24,229 | $2,995 | |
| UA0150 #01 Y:2015 | 01 | 2015 | Utilize higher efficiency lamps and/or ballasts | $25,421 | $49,673 | |
| WM0050 #08 Y:2014 | 08 | 2014 | Upgrade controls on compressors | $1,111 | - | |
| WM0050 #07 Y:2014 | 07 | 2014 | Sell combustible waste | $39,202 | $97,000 | |
| WM0050 #06 Y:2014 | 06 | 2014 | Reduce illumination to minimum necessary levels | $3,302 | $2,100 | |
| WM0050 #05 Y:2014 | 05 | 2014 | Install occupancy sensors | $887 | $1,575 | |
| WM0050 #04 Y:2014 | 04 | 2014 | Turn off equipment during breaks, reduce operating time | $8,029 | - | |
| WM0050 #03 Y:2014 | 03 | 2014 | Utilize higher efficiency lamps and/or ballasts | $2,875 | $1,800 | |
| WM0050 #02 Y:2014 | 02 | 2014 | Turn off equipment during breaks, reduce operating time | $357 | - | |
| WM0050 #01 Y:2014 | 01 | 2014 | Reschedule plant operations or reduce load to avoid peaks | $6,104 | $8,000 |