Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

202

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Hardwood veneer and plywood manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BS0088 #03 Y:2016 Use adjustable frequency drive or multiple speed motors on existing system $31,994 $29,692
BS0088 #02 Y:2016 Lower operating pressure of condenser (steam) $64,374 $480
BS0088 #01 Y:2016 Install / repair insulation on steam lines $7,541 $11,782
UA0156 #05 Y:2016 Utilize energy-efficient belts and other improved mechanisms $27,817 $1,000
UA0156 #04 Y:2016 Reduce the pressure of compressed air to the minimum required $28,560 $700
UA0156 #03 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $30,024 $6,995
UA0156 #02 Y:2016 Utilize higher efficiency lamps and/or ballasts $78,495 $82,466
UA0156 #01 Y:2016 Insulate feedwater tank $34,968 $50,000
UA0150 #04 Y:2015 Utilize energy-efficient belts and other improved mechanisms $6,984 $15,128
UA0150 #03 Y:2015 Reduce the pressure of compressed air to the minimum required $8,195 $800
UA0150 #02 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $24,229 $2,995
UA0150 #01 Y:2015 Utilize higher efficiency lamps and/or ballasts $25,421 $49,673
WM0050 #08 Y:2014 Upgrade controls on compressors $1,111 -
WM0050 #07 Y:2014 Sell combustible waste $39,202 $97,000
WM0050 #06 Y:2014 Reduce illumination to minimum necessary levels $3,302 $2,100
WM0050 #05 Y:2014 Install occupancy sensors $887 $1,575
WM0050 #04 Y:2014 Turn off equipment during breaks, reduce operating time $8,029 -
WM0050 #03 Y:2014 Utilize higher efficiency lamps and/or ballasts $2,875 $1,800
WM0050 #02 Y:2014 Turn off equipment during breaks, reduce operating time $357 -
WM0050 #01 Y:2014 Reschedule plant operations or reduce load to avoid peaks $6,104 $8,000