Assessment Year 2018
Principal Product Wood Veneer
NAICS 321211: Hardwood Veneer and Plywood Manufacturing
SIC 2435: Hardwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 241,500
ft2
Annual Production 16,000
thousand feet
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,522 3,045,200
kWh
Electricity Demand $77,894 8,943
kW-mo/yr
Wood $1 20,000
MMBtu
TOTAL YEARLY COSTS $223,417
RECOMMENDED SAVINGS* $44,179 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,192

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $25,309 $135,942 $14,300
299,166
kWh
$8,770
-
kW-mo/yr
- $2,239
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,172 $200 $1,364
28,539
kWh
$608
-
kW-mo/yr
$(-400.0) $(-400.0)
03 2.4239: Eliminate or reduce compressed air usage $1,006 $1,350 $1,006
21,052
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $981 $100 $671
14,046
kWh
$310
-
kW-mo/yr
- -
05 2.4323: Use optimum size and capacity equipment $4,293 $10,000 $3,436
71,885
kWh
$857
-
kW-mo/yr
- -
06 2.4323: Use optimum size and capacity equipment $9,484 $10,000 $7,592
158,819
kWh
$1,892
-
kW-mo/yr
- -
07 2.4151: Develop a repair/replace policy $1,934 $5,865 $1,251
26,171
kWh
$683
-
kW-mo/yr
- -
TOTAL RECOMMENDED $44,179 $163,457 $29,620
619,678
kWh
$13,120
-
kW-mo/yr
$(-400.0) $1,839
TOTAL IMPLEMENTED $42,192 $162,007 $27,943
584,580
kWh
$12,810
-
kW-mo/yr
$(-400.0) $1,839
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs