*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Sealants, Adhesives, Mortars, Admixtures
NAICS 325520: Adhesive Manufacturing
SIC 2891: Adhesives and Sealants
Sales Range $50
M
to 100
M
# of Employees 168
Plant Area 130,000
ft2
Annual Production 66,138
ton
Production Hrs. Annual 8,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $541,722 8,064,180
kWh
Electricity Demand $111,245 14,832
kW-mo/yr
Electricity Fees $4,603 -
Natural Gas $195,477 34,747
MMBtu
Waste Disposal Costs
Water Usage $312,427 34,792
Tgal
TOTAL YEARLY COSTS $1,165,474
RECOMMENDED SAVINGS* $131,603 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings By-product Production Savings
01 3.4151: Minimize water usage $16,085 $31,231 $(-702.0)
(-10,444)
kWh
$(-113.0)
-
kW-mo/yr
- $17,594
-
Tgal
$(-694.0) -
02 2.4224: Upgrade controls on compressors $22,738 $38,304 $19,490
290,036
kWh
$3,248
-
kW-mo/yr
- - - -
03 2.4322: Use or replace with energy efficient substitutes $20,707 $41,750 $17,962
267,292
kWh
$2,745
-
kW-mo/yr
- - - -
04 2.4157: Establish a predictive maintenance program $12,735 $5,200 $15,499
230,643
kWh
$2,844
-
kW-mo/yr
- - $(-5,608.0) -
05 2.2128: Use steam condensate for hot water supply (non-potable) $11,667 $55,000 $(-2,216.0)
(-32,981)
kWh
- $3,592
-
MMBtu
$9,331
-
Tgal
- $960
06 2.2442: Preheat combustion air with waste heat $5,185 $11,425 - - $5,185
-
MMBtu
- - -
07 2.1233: Analyze flue gas for proper air/fuel ratio $7,003 $3,121 - - $7,003
-
MMBtu
- - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,842 $11,112 $3,162
47,056
kWh
$1,680
-
kW-mo/yr
- - - -
09 2.7135: Install occupancy sensors $4,772 $4,323 $3,909
58,164
kWh
$863
-
kW-mo/yr
- - - -
10 2.2425: Use flue gases to heat process or service water $4,453 $20,950 - - $4,453
-
MMBtu
- - -
11 2.1221: Replace obsolete burners with more efficient ones $4,279 $18,380 - - $4,279
-
MMBtu
- - -
12 2.4151: Develop a repair/replace policy $4,059 $1,304 $3,487
51,895
kWh
$640
-
kW-mo/yr
- - $(-68.0) -
13 2.1221: Replace obsolete burners with more efficient ones $3,130 $2,676 - - $3,130
-
MMBtu
- - -
14 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,031 $684 $2,611
38,852
kWh
$420
-
kW-mo/yr
- - - -
15 2.7142: Utilize higher efficiency lamps and/or ballasts $2,433 $11,061 $1,902
28,289
kWh
$531
-
kW-mo/yr
- - - -
16 2.4231: Reduce the pressure of compressed air to the minimum required $1,980 $304 $1,710
25,450
kWh
$270
-
kW-mo/yr
- - - -
17 2.4221: Install compressor air intakes in coolest locations $1,209 $3,002 $1,044
15,529
kWh
$165
-
kW-mo/yr
- - - -
18 2.2511: Insulate bare equipment $664 $914 - - $664
-
MMBtu
- - -
19 2.7314: Reduce ventilation air $631 $2,400 - - $631
-
MMBtu
- - -
TOTAL RECOMMENDED $131,603 $263,141 $67,858
1,009,781
kWh
$13,293
-
kW-mo/yr
$28,937
-
MMBtu
$26,925
-
Tgal
$(-6,370.0) $960
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Personnel Changes Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs