ITAC Assessment: OR0701
ITAC logo
ITAC Assessment: OR0701
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product veneer/hydromulch
NAICS 321211: Hardwood Veneer and Plywood Manufacturing
SIC 2435: Hardwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 100,000
ft2
Annual Production 600,000
units
Production Hrs. Annual 5,200
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $359,763 8,373,600
kWh
Electricity Demand $186,739 23,608
kW-mo/yr
Electricity Fees $630 -
Natural Gas $108,991 33,932
MMBtu
Wood $190,789 27,720
MMBtu
TOTAL YEARLY COSTS $846,912
RECOMMENDED SAVINGS* $67,227 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 4.444: Install system to collect scrap $35,903 $29,900 - - $35,903 - -
02 2.2128: Use steam condensate for hot water supply (non-potable) $17,929 $8,549 - - - $17,929 -
03 2.4131: Size electric motors for peak operating efficiency $11,954 $11,773 $10,174
211,958
kWh
$1,780
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,441 $4,175 $1,010
21,045
kWh
$234
-
kW-mo/yr
$238 - $(-41.0)
TOTAL RECOMMENDED $67,227 $54,397 $11,184
233,003
kWh
$2,014
-
kW-mo/yr
$36,141 $17,929 $(-41.0)
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs