Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Pallets and Mats
NAICS 321211: Hardwood Veneer and Plywood Manufacturing
SIC 2435: Hardwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 500
Plant Area 500,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 5,375
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,771,679 20,843,640
kWh
Electricity Fees $(-25,639.0) -
Wood $415,488 325,466
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $199,864 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $142,023

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Wood Savings
01 2.2123: Insulate feedwater tank $34,968 $50,000 - - $34,968
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $78,495 $82,466 $79,647
937,023
kWh
$(-1,152.0) -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $30,024 $6,995 $30,465
358,415
kWh
$(-441.0) -
04 2.4231: Reduce the pressure of compressed air to the minimum required $28,560 $700 $28,979
340,934
kWh
$(-419.0) -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $27,817 $1,000 $28,225
332,060
kWh
$(-408.0) -
TOTAL RECOMMENDED $199,864 $141,161 $167,316
1,968,432
kWh
$(-2,420.0) $34,968
-
MMBtu
TOTAL IMPLEMENTED $142,023 $133,166 $108,626
1,277,957
kWh
$(-1,571.0) $34,968
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs