ITAC Assessment: HO0132
ITAC logo
ITAC Assessment: HO0132
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Textile Dyers
NAICS
n/a
SIC 2269: Finishers of Textiles, Not elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 20,000
ft2
Annual Production 8,000,000
lb
Production Hrs. Annual 8,730
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,973 762,310
kWh
Electricity Demand $15,348 1,680
kW-mo/yr
Electricity Fees $7,465 -
Natural Gas $301,024 89,680
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $108,999 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $96,937

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,509 $16,309 $4,303
74,736
kWh
$1,206
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $688 $937 $688
12,016
kWh
- - -
03 2.7135: Install occupancy sensors $122 $400 $122
2,052
kWh
- - -
04 2.2414: Use waste heat from hot flue gases to preheat $23,949 $13,764 - - $23,949
-
MMBtu
-
05 2.2136: Install / repair insulation on steam lines $5,862 $2,993 - - $5,862
-
MMBtu
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $569 $560 $569
9,672
kWh
- - -
07 3.4112: Recovery metals from rinse water(evap., ion exchange, ro, electrolysis, electrodialysis) and reuse rinse water $72,300 $287,000 - - - $72,300
-
Tgal
TOTAL RECOMMENDED $108,999 $321,963 $5,682
98,476
kWh
$1,206
-
kW-mo/yr
$29,811
-
MMBtu
$72,300
-
Tgal
TOTAL IMPLEMENTED $96,937 $301,701 $688
12,016
kWh
- $23,949
-
MMBtu
$72,300
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs