ITAC Assessment: TN0654
ITAC logo
ITAC Assessment: TN0654
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Gasoline, kerosene, diesel fuel and fuel oil
NAICS
n/a
SIC 2911: Petroleum Refining
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 65,000
ft2
Annual Production 900,000
bbl
Production Hrs. Annual 6,240
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $111,215 4,060,375
kWh
Electricity Demand $27,625 6,562
kW-mo/yr
Electricity Fees $17,446 -
Natural Gas $196,999 48,625
MMBtu
Other Gas $3,276,000 570,800
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $268,780 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $196,005

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Natural Gas Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings Primary Product Savings By-product Production Savings
01 2.1331: Burn a less expensive grade of fuel $144,460 $25,120 $144,460
-
MMBtu
- - - - - -
02 2.1331: Burn a less expensive grade of fuel $68,850 $265,960 $115,590
-
MMBtu
- - - - - $(-46,740.0)
03 3.4111: Use closed cycle process to minimize waste water production $29,975 $18,950 $4,455
-
MMBtu
$2,220
-
Tgal
- $22,190 $1,110
-
Tgal
- -
04 2.1221: Replace obsolete burners with more efficient ones $9,840 $22,720 $9,840
-
MMBtu
- - - - - -
05 4.431: Train operators for maximum operating efficiency $9,000 $16,000 - - - - - $9,000 -
06 3.4113: Treat and reuse rinse waters $3,925 $9,680 - $4,725
-
Tgal
$(-1,000.0) - $200
-
Tgal
- -
07 2.2511: Insulate bare equipment $2,730 $3,310 $2,730
-
MMBtu
- - - - - -
TOTAL RECOMMENDED $268,780 $361,740 $277,075
-
MMBtu
$6,945
-
Tgal
$(-1,000.0) $22,190 $1,310
-
Tgal
$9,000 $(-46,740.0)
TOTAL IMPLEMENTED $196,005 $86,100 $161,485
-
MMBtu
$2,220
-
Tgal
- $22,190 $1,110
-
Tgal
$9,000 -
Yearly Savings* Imp'd Cost* Natural Gas Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings Primary Product Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs